House teardowns and demolition for rebuilds on Salt Lake's east side, with the site cleared and ready to dig.

On Salt Lake's east side, many new homes start with an old one coming down. Ritz Excavation & Demolition tears down houses, garages and outbuildings in Holladay, Millcreek, Cottonwood Heights and across the valley, then hauls the debris and leaves a clean, level lot.
Because we also dig basements and foundations, the same crew can take a lot from the teardown straight to the new excavation, with no gap between contractors.
We plan for lakebed clay, cobble, groundwater and frost before we price the job, so it doesn't turn into a surprise halfway through.
Pre-1990s houses often need an asbestos survey and abatement before demo.
Established lots mean fences, trees and homes a few feet away.
Old foundations and slabs come out so the new dig starts clean.
Debris is loaded and hauled as the work goes, not left in piles.
Tearing down an older home to rebuild, or removing a garage, shed or addition.
Teardowns cleared and ready on your schedule, with the excavation to follow.
Every job is priced to the site after we've seen it.
We stick to the dirt work and coordinate with these trades on your project:
“Jeff is a fantastic and talented contractor. Jeff’s capabilities with equipment, like an excavator, are second nature to him. He’s fantastic at excavation work, building rock walls, creating waterfalls, etc.”
Do I need an asbestos inspection before tearing down a house in Utah?
In most cases, yes. The Utah Division of Air Quality requires an inspection by a Utah-certified asbestos inspector before a demolition, and any regulated asbestos must be removed by a certified company first. Homes built after 1992 may be exempt from the inspection, but the state demolition notification still applies.
How long before demolition can start in Utah?
A demolition notification has to be filed with the Utah Division of Air Quality at least 10 working days before work begins, even when no asbestos is found. The city demolition permit, utility shutoffs and any asbestos removal also need to be done first.
What permits does a teardown need in Cottonwood Heights or Millcreek?
Expect a city demolition permit. Cottonwood Heights, for example, asks for a pre-demolition inspection form from the Salt Lake Valley Health Department and the state demolition notification before it issues the permit, along with utility disconnects. Check your city's checklist before you set a demo date.
Can you dig the new basement after the teardown?
Yes. We do basement and foundation excavation too, so the lot can go straight from demolition to the new dig.
Do you remove concrete?
Yes. We break out and haul old foundations, slabs, patios and driveways as part of demolition. We do not pour new concrete.
We provide this service across Salt Lake, Utah, Summit and Wasatch counties. Choose your area to learn more.
Contact Ritz Excavation & Demolition for an estimate on your project in Salt Lake, Utah, Summit or Wasatch County.